A commented draft
We read each reply alongside the inspector’s finding. Our comments identify unanswered points, statements that need evidence and wording that could give the wrong impression about work already completed.
W2 reviews a site’s draft reply to an MHRA GMP inspection. We check each finding against the evidence, flag open commitments and give the quality team a commented draft before the licence holder submits its response.

For a first conversation, tell us when your MHRA response is due, how far the draft has progressed and which findings your quality team would like a second opinion on. A short description is enough to agree the scope and timing.
Once we agree a secure route for exchanging documents, share the relevant findings, your draft replies and any commitments already made. Remove personal details that are unnecessary for the review. We can then identify which supporting records would help us test a particular statement.
For an example of the work after an audit, read how a site put a document-control CAPA into practice, from signed master documents to staff training and SOP read records.
Discuss a draft response in confidenceWe read each reply alongside the inspector’s finding. Our comments identify unanswered points, statements that need evidence and wording that could give the wrong impression about work already completed.
We check whether each proposed action has an owner, a realistic date and a way to demonstrate effectiveness. We highlight where the wider investigation or an interim control still needs explaining.
We take your team through the outstanding questions and proposed edits. The licence holder’s quality team decides what it can commit to, approves the final wording and submits the response in line with the inspection letter.
A draft says an obsolete check sheet has been withdrawn. A reviewer asks which records used that version, whether other issue points held old copies, and how the site will verify future replacements. The document control lead proposes checking copies in use against the issue register for the next three changes.
The W2 workbook for design reviews and GMP actions (Excel) includes this example and blank rows for internal action tracking. For the formal reply, follow the inspection letter and the MHRA’s guidance on post-inspection responses.
Read the inspection-response guide or explore longer-term GMP remediation support if your team needs help delivering its actions.
Tell us the response date and the stage your draft has reached. W2 can then agree the scope of a review with your quality team.